Big Tree Ball Field |
|
![Big Tree Ballfield Arial Photo](../images/Commercial/Big%20Tree/btree.jpg)
|
|
The City of South Daytona has
just built a new
Ball Field complex and TYL Construction was blessed to be a part of it. |
![horizontal rule](../_themes/blueprnt/bluhorsa.gif)
The Construction Team
Mark T. Juliano,
City of South Daytona Public Works
Greg Batholomew, City
of South Daytona Parks & Recreation
John Dillard, Zahn
& Dillard Consulting Engineers
John Hall, Hawkins
& Hall Architects
![horizontal rule](../_themes/blueprnt/bluhorsa.gif)
|
The following photos will be in
reverse order,
newest photos on top:
This Is The Goal That We Have Been Working For!
Mr. David Achilles,
Chief Building Official for the City of South Daytona
approving the final inspections for the project. |
![Mr. David Achilles](../images/Commercial/Big%20Tree/bigtree20.jpg) |
![Almost Ready!](../images/Commercial/Big%20Tree/bigtree19.jpg)
|
Almost Ready to
PLAY BALL! |
The Pavilion
was Hand-crafted with
Prayer and Pride
by:
Don Stafford
Pete Comella
Gary Myers
Tommy Clayton
all of:
TYL Construction, Inc. |
![Inside The Pavilion](../images/Commercial/Big%20Tree/bigtree18.jpg)
|
![Measuring the playground.](../images/Commercial/Big%20Tree/bigtree17.jpg)
|
Measuring for the Playground.
(Left to Right)
John Dillard
Engineer
Mark T. Juliano
South Daytona Public Works Director
Greg Bartholomew
South Daytona Parks & Recreation
|
|
Putting up the backstop
protective netting. |
![Placing the backstop protective netting.](../images/Commercial/Big%20Tree/bigtree12.jpg) |
![Placing the first of the light poles.](../images/Commercial/Big%20Tree/bigtree13.jpg)
|
Placing the first
of the 80 foot
light poles! |
![Rubbing the Counter](../images/Commercial/Big%20Tree/bigtree11.jpg)
|
Putting the final touches on the hand rubbed concrete
serving counter. |
Finishing the Framing of the Concession Stand. |
![Concession Stand Framing](../images/Commercial/Big%20Tree/bigtree10.jpg) |
![Framing the concession stand.](../images/Commercial/Big%20Tree/bigtree05.jpg)
|
Framing the Concession Stand. |
The Pavilion Roof Framing |
![Pavilion Framing](../images/Commercial/Big%20Tree/bigtree02.jpg) |
![Pavilion Beam](../images/Commercial/Big%20Tree/bigtree03.jpg)
|
Preparing to pour the pavilion concrete support beam. |
An interesting perspective
of the steel required
Inside the
Pavilion support beam |
![Pavilion Steel](../images/Commercial/Big%20Tree/bigtree04.jpg) |
![Concession Stand Foundation](../images/Commercial/Big%20Tree/bigtree06.jpg)
|
The Concession Stand foundation ready for concrete. |
Watering the Pavilion concrete and burlap as required by the
specifications. |
![Watering Concrete](../images/Commercial/Big%20Tree/bigtree07.jpg) |
![Sign Footer](../images/Commercial/Big%20Tree/bigtree08.jpg)
|
Preparing the footer steel for the Sign foundation. |
The kickoff to this project was the Retaining Wall.
This was the day that the footer was dug. |
![Retaining Wall Footer](../images/Commercial/Big%20Tree/bigtree09.jpg) |
|